labour and materials required 10cum of rcc concrete
Home | labour and materials required 10cum of rcc concrete

416 kg, Water- 175 Liters, Concrete Admixture (FOSROC or PEDLITE)- 1.5 Lit) for all RCC works including cost and conveyance of all materials and cement to work site. The rates including all cost and labour charges for mixing the concrete, laying, vibrating, watering with all leads for good water and curing and compacting the concrete and all other

1) Laying reinforced concrete – 3 beldars, 3 mazdoors, 1½ Bhisti and ½ mason can do 2.83 cum (100cuft) per day. 2) Centering and shuttering for flat surfaces – 4 beldars and 4 carpenters (II class) can do 9.6sqm(96sqft) per day.

Advantages of Reinforced Concrete as a Structural Material Reinforced concrete is the most important material available for construction. 1. It has considerable compressive strength per unit cost compared with most other materials. 2. Reinforced concrete has great resistance to …

Cost of Water Charges: 1 to 2% of cost of materials and labour. e. Cost of over head and profit: 10% of cost of materials and labour. Total Cost = a+b+c+d+e QUANTITY FOR RATE ANALYSIS General quantity taken for the rate analysis are as follows For mass works: 10cum (Example: Cement Concrete work, Stone and Brick masonry work etc.,

Quantity of Materials required for different items of works Name of work Per Unit Materials Quantity Brickwork 10 cum 19x9x9 5000nos Dry cement mortar 3.5cum Half brick 100 sqm 19x9x9 5000nos Random rubble masonry 10 cum stone 12.5cum Dry cement mortar 4.2cum Ashlar masonry 10 cum stone 12.5cum Brick soling 10 sqm 19x9x9 425nos Brick on edge ...

into the labor, material and equipment costs. Thus type of estimate need to have a design available to get such required details. This chapter introduces the details of estimating labor, equipment and material costs as the basis for detailed cost estimate of construction projects. 4.1 …

Answer: I shall give the specifications and quantities of materials and labour required for TEN CUBIC METER and you convert for cubic feet:- Brickwork in cement mortar 1:5 [one of cement and five of sand ] in foundations and basement using second class ground moulded chamber burnt bricks of size...

20mm Aggregate 40km Rs.75/CUM Cement Rs.165/ Bag at site of work Vibrator charges Rs.15/CUM Mixer Machine hire charges Rs.100/CUM Labor for 10CUM of concrete 3.5Nos Mason II Class Rs. 150/each/day 5.5Nos Mazdoor I Class Rs.100/each/day 16Nos Mazdoor II Class Rs.75/each/day Material Quantity in 10 CuM of 1:2:4 RCC Mix Items UoM Calculation Value ...

all cost, laying of concrete, watering, curing, conveyance, T & P, royalties, taxes of all materials required for the work, Scaffolding & labour charges etc complete as per direction of Engineer-in charge 5 cum 10 RCC ( 1:1.5:3 ) 12 to 20mm graded HG Chips Reinforced cement concrete(1:1.5:3) for all type of work using 12 to 20mm graded hard ...

Per day productivity required = 6000/7 = 858 Sqm. Carpenter + Carpenter helper required = 858 /7 = 123 Nos. (Productivity = 7 Sqm/day/(C+CH)) Barbender Required . Concrete work qunatum = 4000 x0.15 = 600 Cum (considered 0.15 thk of slab) Quantum of reinforcement work = 600 x 0.1 = 60 MT. Per day productivity required = 60/7 = 8.57 MT

Gronolithie Concrete Flooring 20 mm thick with (1:1:2), using 6mm to 12 mm size hard granite machine crushed metal laid over CC bed already laid or RCC roof slab, in alternate panels of size not exceeding 1.50 m x 1.50 m and finishing the top surface to required smoothness and slopes and thread lining including cost of all materials like cement ...

In this excel sheet you all find about the following section. Notes:- In all cells of the attached excel sheet mentioned custom formula simply you can put your value and get exact results, Go and Download (Estimate of Materials and Labor Excel Sheet Download ) 3. Quantity & Rate Analysis Excel Sheets for Construction. 4.

Material estimation include sand, cement, coarse aggregate and steel for a particular mix design. Let us consider a mix design of 1:1.5:3 for our estimation practice.The dry volume of total materials required is considered as 1.54 times the wet volume of concrete, due to voids present in sand and aggregates in dry stage.

10 cum 253.87 11 11.1 sqm 18.40 11.2 sqm 23.04 Description of Item Concrete Work Dry Lean Cement Concrete Sub- base (Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1,

🕑 Reading time: 1 minuteToday we will see how to prepare rate analysis for Reinforced Concrete (RCC) work. First step to rate analysis is the estimation of labour, materials, equipments and miscellaneous items for particular quantity of reinforced concrete. The second step is to determine the component of structure for which the RCC rate analysis […]

CHAPTER 16 - RCC AND FORM WORK Notes: - 1. Rates include- (a) Lead up to 100 m for all materials for all items. (b) Cost of all material including cost of water. (c) All lifts for all materials unless specified otherwise. (d) Mixing of concrete in mixer. (e) Mechanical vibration of concrete. (f) Finishing to all surfaces of R.C.C. (g) Cost of ...

Labor Requirement for Various Construction Works. There are different types of labors that are required for the construction: Skilled labor. Semi-skilled labor. Unskilled labor. All these types of labors have different skills and different salaries. Their optimum use in every work in construction is essential to minimize the construction cost.

namely, Material, Labour, Machinery and Overheads. There are no limitations on ... RCC M20 Rcc M20 (1:1.5:3) concrete in Ordinary Works 200.000 cu.mt 4436.00 887200.00 ... easy to use and so special training is required. For more details, Get in touch with us Today ! Title: Microsoft Word - RateAnlyWriteupColour3page.doc ...

materials for different mix ratio quantity estimation of materials is essentially required in any construction works and quantity of materials depend on the mix proportions of the concrete in our previous article we have already discussed how to calculate bricks in a wall today we will discuss how to calculate quantities of materials, labour ...

It is a reinforced concrete framed structure consisting of G +2 with adequate ... wash and then colouring as required. All the joiners and iron ... II Laying of PCC M10 (1:3:6) using 40mm HBG metal including cost and conveyance of all materials and labour charges etc., a. Mechanical & Security room 4*1 1.00 1.00 0.15 6.00 16.70 b. Toilets 2*1 1 ...

how much quantity of cement and sand required for construction of 10 cum brick work ( Brick size 3.. Answer / karan bagga. lets the take size of brick is .230*.115*.075. now calculate. the quantity for 10 cum. Area of one brick without mortar -0.00198375 Cum. No of brick in 10 cum…

Answer (1 of 3): Mason 3.7 days Labour 35 days Water carrier 13.9 days Bar bender 1 day/ 100 kg Mixer operator-0.72 days Vibrator operator0.72 days Day means 8 hours with lunch break of …

Reinforced Cement Concrete:- Reinforced concrete, or RCC, is concrete that contains embedded steel bars, plates, or fibers that strengthen the material. The capability to carry loads by these materials is magnified, and because of this RCC is used extensively in all construction. In fact, it has become the most commonly utilized construction material.

The cost of construction project highly depends on the requirements of labour for various activities during construction. There are direct and indirect costs associated with the labour. They are the salary of labours, their accommodation, food, insurance cost etc. Thus it is essential to understand the number labours required for each activity of the construction…

March 5, 2017 TeamCivil Construction. In order to perform rate analysis for reinforced concrete, two steps are involved: 1- Estimation of number of labour and equipment, quantity of materials, miscellaneous items required for for a certain quantity of reinforced concrete. 2- Determination of structural element for which the rate analysis is needed.

For a basic project in zip code 47474 with 120 square feet, the cost to Install a Cement Slab starts at $7.73 - $9.49 per square foot*. Actual costs will depend on job size, conditions, and options. To estimate costs for your project: 1. Set Project Zip Code Enter the Zip Code for the location where labor is hired and materials purchased.

Following four materials are required for making R.C.C.: 1. Cement 2. Aggregates 3. Steel 4. Water. 1. Cement: Before the introduction of ordinary Portland cement, the lime was used as a cementing material. Most of the cement concrete work in building construction is done with …

Analysis of rates for labour and material. The capacity of doing work by an artisan or skilled labour in the form of quantity of work per day is known as the task work or out turn of the labour. The out-turn of work per artisan varies to some extent according to the nature, size, height, situation, location, etc.,

shall be included in the cost of the reinforced concrete moment slab. The cost of all labor and materials required to provide for the monolithic concrete coping with moment slabs shall be included in the cost of the moment slab. The cost of furnishing and placing all materials …

In a project budget, the toughest thing is to identify the source of material and required manpower calculation. We have to deploy adequate manpower to complete a certain activity without any chaos.. In this post, we had listed out the approx labour requirement for civil works and also Labour output per day for different works.. In the earlier post, we had seen the material calculation for ...